NEW QUESTION 10
What is the difference between co-products and by-products?

  • A. Only by-products have a zero inventory valuation.
  • B. Only co-products can be manufactured in isolation from the main product.
  • C. Only co-products are identified by a special item category in the bill of material (BOM).
  • D. Only co-products appear in the process or production order settlement rule.

Answer: D

 

NEW QUESTION 11
In order to use strategy 70 - Planning At Assembly Level, what order field must be set besides the planning strategy?
Please choose the correct answer.
Response:

  • A. Dependent Requirements indicator
  • B. Individual/Collective Indicator
  • C. Storage Location MRP Indicator
  • D. Mixed MRP indicator

Answer: D

 

NEW QUESTION 12
In your project, you have several materials that are planned by different people. How can you assign the planning responsibility?

  • A. MRP group
  • B. MRP controller
  • C. MRP planning file
  • D. MRP type

Answer: B

 

NEW QUESTION 13
In which data objects do you maintain the production line as the work center for repetitive manufacturing?
Note: There are 2 correct answers to this question.

  • A. Repetitive manufacturing profile
  • B. Production version
  • C. Routing
  • D. Production cost collector

Answer: B,C

 

NEW QUESTION 14
You have maintained the parameters for simple discontinuation the material master of a component. Which business process will be affected if the available stock is zero and the discontinuation date is in the past?

  • A. Kanban
  • B. Material requirements planning
  • C. Production order release
  • D. Back flushing

Answer: B

 

NEW QUESTION 15
What are some of the advantages of using Kanban?
There are 2 correct answers to this question.
Response:

  • A. It is a simplified form of production control
  • B. Replenishments are based on centralized planning
  • C. Replenishments are created close to the actual need
  • D. It is mostly accomplished by manual postings

Answer: A,C

 

NEW QUESTION 16
In your plant, MRP is activated. Which options do you have to exclude a material from the MRP run? Note:
There are 2 correct answers to this question.

  • A. Use a specific MRP type.
  • B. Use a specific material status.
  • C. Use a specific MRP controller.
  • D. Use a specific material group

Answer: A,C

 

NEW QUESTION 17
Your quality department detects a deviation in a raw material batch. Unfortunately, this batch has already been used in production. How can you identify all affected finished goods stocks?

  • A. Use the material staging report.
  • B. Use the material where-used report.
  • C. Use batch determination.
  • D. Use the batch information cockpit.

Answer: D

 

NEW QUESTION 18
In a production process, you need a certain amount of liquid as input material. The source tank is directly connected to the reactor. How can you process consumption postings?

  • A. Kanban
  • B. Picking list
  • C. Transfer Order
  • D. Backflushing

Answer: B

 

NEW QUESTION 19
In which of the following master data objects can you define the production order default storage location for a material component?
There are 2 correct answers to this question.
Response:

  • A. Work center, in the production supply area
  • B. Routing, in the component allocation
  • C. Material master of the finished product
  • D. BOM, in the item for the material

Answer: A,D

 

NEW QUESTION 20
At the end of the MRP run you receive the exception message "Reschedule In Operation". What caused the message to be generated?
Please choose the correct answer.
Response:

  • A. The requirement no longer exists
  • B. The requirements date occurs before that of a firmed planned receipt
  • C. The requirements date occurs that of a firmed planned receipt
  • D. A firmed planned receipt cannot be rescheduled

Answer: B

 

NEW QUESTION 21
Which of the following is used by the MRP Live planning run in SAP S/4HANA?
Please choose the correct answer.
Response:

  • A. Net change planning
  • B. Parallel processing across servers
  • C. MRP list
  • D. Planning horizon

Answer: A

 

NEW QUESTION 22
During planning you are facing an overload situation on a resource. Which activities do you consider to create a feasible production plan?
There are 3 correct answers to this question.
Response:

  • A. Use rescheduling with an alternative mode
  • B. Use optimization with respect to set-up times
  • C. Use multilevel MRP run for the products on the resource
  • D. Use a bucket-oriented capacity check
  • E. Use DS heuristic "Schedule Sequence"

Answer: A,B,E

 

NEW QUESTION 23
For which planning-relevant data objects do you set just one indicator to include then in PP/DS?
There are 2 correct answers to this question.
Response:

  • A. Plant
  • B. Work center
  • C. Material
  • D. Production version

Answer: B,C

 

NEW QUESTION 24
Which data model changes have been implemented in Sales and Distribution?
There are 3 correct answers to this question.
Response:

  • A. Elimination of output condition tables
  • B. Elimination of status tables
  • C. Elimination of LIS tables for rebates
  • D. Elimination of customer master tables
  • E. Elimination of document index tables

Answer: B,D,E

 

NEW QUESTION 25
What are possible configuration steps when setting up the alert monitor in Advanced Planning? Note: There are 3 correct answers to this question.

  • A. Create object selection variant for transportation lane-related alerts.
  • B. Create object selection variant for product-related alerts.
  • C. Assign the alert profile to the overall profile.
  • D. Create object selection variant for resource-related alerts
  • E. Assign the overall profile to the authorization profile.

Answer: B,C,D

 

NEW QUESTION 26
Which actions does the system perform by default when you save a confirmation for a finished product in repetitive manufacturing? Note: There are 3 correct answers to this question.

  • A. Posting of production costs to the production cost collector
  • B. Archiving of documents for assembly scrap
  • C. Posting of goods receipt for the product
  • D. Reduction of associated capacity requirements
  • E. Material staging for next order in sequence

Answer: A,C,D

 

NEW QUESTION 27
Which times are used for Basic Date Scheduling of manufacturing planned orders in MRP?
There are 2 correct answers to this question.
Response:

  • A. Float before and float after production
  • B. Opening period
  • C. Goods receipt processing time
  • D. Setup time

Answer: A,D

 

NEW QUESTION 28
Which advanced functionality has been embedded in SAP S/4HANA?
There are 3 correct answers to this question.
Response:

  • A. Backorder processing
  • B. Available-to-promise
  • C. Supply Network Planning
  • D. Demand planning
  • E. Capacity planning

Answer: A,B,E

 

NEW QUESTION 29
When do you use variant bills of materials (BOMB)?

  • A. When multiple material is have similar BOMB
  • B. When a material has multiple BOMB
  • C. When multiple material also have the same BOM
  • D. When a material has a configurable BOM

Answer: C

 

NEW QUESTION 30
......