NEW QUESTION # 14
Advanced Planning uses master data from SAP S/4HANA Cloud Private Edition. In which data objects can you set the Advanced Planning flag? Note: There are 2 correct answers to this question.
- A. Work center
- B. Plant
- C. Material
- D. Production version
Answer: A,C
NEW QUESTION # 15
Which chart types does the tabular planning table for capacity planning provide in SAP S/4HANA Cloud Private Edition?
Note: There are 2 correct answers to this question.
- A. Capacity requirements chart
- B. Order (dispatched) chart
- C. Work center capacities chart
- D. Order (pool) chart
Answer: A,C
NEW QUESTION # 16
Which SAP applications can be used for forecasting in Supply Chain Planning? Note: There are 2 correct answers to this question.
- A. Capacity Requirements Planning (CRP)
- B. Material Requirements Planning (MRP)
- C. Supply Chain Management (SCM)
- D. Integrated Business Planning (IBP)
Answer: C,D
NEW QUESTION # 17
Which time elements are part of a routing operation? Note: There are 3 correct answers to this question.
- A. Pick time
- B. Processing time
- C. Wait time
- D. Float before production
- E. Setup time
Answer: B,C,E
NEW QUESTION # 18
What could be the reason for different combinations of components in a multiple bill of material (BOM)? Note: There are 2 correct answers to this question.
- A. Manufacturing date
- B. Lot size
- C. BOM component status
- D. BOM header status
Answer: A,B
NEW QUESTION # 19
You want to set up a maketoorder planning scenario for a finished product. The bill of material contains two components: one should be procured for eac sales order individually the other should be procured jointly for all independent requirements. Forecasting for the finished product is NOT possible. Which settings do you make to achieve this?
- A. Choose planning strategy 50 (Planning without final assembly) select the corresponding Individual/Collective indicator.
- B. Choose planning strategy 20 (MaketoOrder) select the corresponding Mixed MRP indicator.
- C. Choose planning strategy 50 (Planning without final assembly) select the corresponding Mixed MRP indicator.
- D. Choose planning strategy 20 (MaketoOrder) select the corresponding Individual/Collective indicator.
Answer: D
NEW QUESTION # 20
What are prerequisites for a production version to be selected for a production order? Note: There are 3 correct answers to this question.
- A. The production quantity must lie within the lot-size range of the production version.
- B. The basic end date of the order must lie within the validity period of the production version.
- C. The production version must NOT be deleted.
- D. The basic start date of the order must lie within the validity period of the production version.
- E. The production quantity must only lie within the lot-size range of the routing in the production version.
Answer: A,D,E
NEW QUESTION # 21
What are some advantages of using Kanban for material supply? Note: There are 2 correct answers to this question.
- A. Replenishment is only triggered when components are required.
- B. Replenishment is always triggered on a regular basis.
- C. Material is only kept available in small quantities in production.
- D. Material stock is built up for a long period of time in production.
Answer: A,C
NEW QUESTION # 22
How can you limit the validity of a bill of material (BOM)? Note: There are 2 correct answers to this question.
- A. By material type
- B. By material status
- C. By period
- D. By plant
Answer: C,D
NEW QUESTION # 23
Your company manufactures materials whose characteristics differ for each manufacturing process.
Which application do you choose in SAP S/4HANA to track and use this information in all areas of logistics?
- A. Engineering change management
- B. Quality management
- C. Batch management
- D. Process order management
Answer: C
NEW QUESTION # 24
Which operations are considered in the capacity scheduling table?
Note: There are 2 correct answers to this question.
- A. Only bottleneck operations
- B. All operations
- C. Sub-operations
- D. Operations assigned to a pacemaker work center
Answer: A,C
NEW QUESTION # 25
Which settings can you make in a production scheduling profile?
Note: There are 3 correct answers to this question.
- A. Automatic goods receipt on confirmation
- B. Automatic print on order creation
- C. Automatic release on order creation
- D. Default order types
- E. Automatic goods issue on confirmation
Answer: A,C,D
NEW QUESTION # 26
What does Consumption-based Planning use to determine requirements in the future?
Note: There are 3 correct answers to this question.
- A. Dependent requirements
- B. Historical values
- C. Planning file entries
- D. Forecasting
- E. Statistical procedures
Answer: B,D,E
NEW QUESTION # 27
Which time elements does MRP consider in backward scheduling to determine the basic dates for components from depender Note: There are 2 correct answers to this question.
- A. Planned delivery time
- B. Inhouse production time
- C. Total replenishment lead time
- D. Operation duration
Answer: A,B
NEW QUESTION # 28
What data can you maintain in the items detail screen of a bill of material (BOM)?
Note: There are 2 correct answers to this question.
- A. Change number
- B. Lot size
- C. Co-product
- D. Alternative item group
Answer: C,D
NEW QUESTION # 29
You want to use capacity availability checks for production orders. Which settings have to be made for this?
Note: There are 2 correct answers to this question.
- A. An overall profile must be assigned in the checking control.
- B. A checking rule must be assigned to the work centers.
- C. The Relevant for Finite Scheduling indicator must be set.
- D. The scope of check must be defined in Customizing.
Answer: A,C
NEW QUESTION # 30
How can you support a GMP (Good Manufacturing Practice) compliant production process? Note: There are 3 correct answers to this question.
- A. Approved resources
- B. Batch record
- C. GMPcompliant flag
- D. Digital signature
- E. Recipe approval
Answer: B,D,E
NEW QUESTION # 31
Your company manufactures materials whose characteristics differ for each manufacturing process.
Which application do you have to use in SAP S/4HANA Cloud Private Edition to be able to track use this information in all areas of logistics?
- A. Engineering change management
- B. Quality management
- C. Batch management
- D. Process order management
Answer: C
NEW QUESTION # 32
Which business processes are affected by settings in the order type dependent parameters? Note: There are 2 correct answers to this question.
- A. Schedule production orders.
- B. Define integration with cost accounting.
- C. Check material availability.
- D. Select master data.
Answer: B,D
NEW QUESTION # 33
In SAP documentation for MRP in Advanced Planning, you read that the MRP creates new planned orders through infinite scheduling. What does this mean for the capacity requirements of the new planned order?
- A. MRP creates the capacity requirements without considering existing load on the resources.
- B. MRP automatically assigns the capacity requirements to resources with the earliest available capacity.
- C. MRP creates the capacity requirements on resources at the earliest possible production time.
- D. MRP automatically assigns the capacity requirements after the last scheduled operation for each resource.
Answer: A
NEW QUESTION # 34
You want to verify that the properties of a component batch align with the required properties of the raw material intended for a specific process order. What function do you use to accomplish this?
- A. Batch information cockpit
- B. Batch where-used list
- C. Batch determination
- D. Batch number assignment
Answer: C
NEW QUESTION # 35
In the context of the capacity scheduling table, how do you define a pacemaker work center?
- A. By assigning it to the bottleneck operation
- B. By assigning it to the production version
- C. By assigning it to the capacity scheduling table
- D. By assigning it to the first operation of a routing
Answer: B
NEW QUESTION # 36
How are dependent requirements for assemblies created? Note: There are 2 correct answers to this question.
- A. They are created with exact times in Advanced Planning.
- B. They are only created for multilevel bill of material (BOM) structures.
- C. They are created together with the independent requirement for the finished product.
- D. They are created on assembly level during the planning run.
Answer: A,D
NEW QUESTION # 37
......
SAP C-TS422-2504 Exam Syllabus Topics:
| Topic | Details |
|---|---|
| Topic 1 |
|
| Topic 2 |
|
| Topic 3 |
|
| Topic 4 |
|
| Topic 5 |
|
| Topic 6 |
|
Detailed New C-TS422-2504 Exam Questions for Concept Clearance: https://vceplus.actualtestsquiz.com/C-TS422-2504-test-torrent.html