Download Cisco 700-821 Mock Test Study Material [Q18-Q36]

Share

Download Cisco 700-821 Mock Test Study Material

700-821 Questions Prepare with Learning Information

NEW QUESTION # 18
What is a requirement for the IE3400 power supply?

  • A. If the PoE budget is insufficient with power input A, a second power supply can boost the PoE budget by connecting to power input B.
  • B. When ordering IE4000, always order power supplies regardless of the power input at the site (AC or DC).
  • C. It is important to understand from the customer if PoE is needed and if the site power source is AC or DC.
  • D. For a PoE+ requirement, an AC input power supply is required.

Answer: C


NEW QUESTION # 19
Which two IoT routers or gateways are used when a customer requests two active LTE connections? (Choose two.)

  • A. IR1101 with expansion module and cellular modules
  • B. IG21 gateway
  • C. IR1821 with dual cellular modules
  • D. IR1101 without expansion module
  • E. IR1831 with dual cellular modules

Answer: A,E


NEW QUESTION # 20
Which IE product is ideal as a replacement for unmanaged switches where small form factor, basic switching features, and fast boot time are mandatory requirements?

  • A. IE 4000 Series
  • B. IE 1000 Series
  • C. IE 2000 Series
  • D. IE 3000 Series

Answer: B


NEW QUESTION # 21
As a Tri-Radio architecture, which three frequencies are supported on IW9167E? (Choose three.)

  • A. 160MHz
  • B. 900MHz
  • C. 2.4GHz
  • D. 6GHz
  • E. 5GHz
  • F. 1GHz

Answer: C,D,E


NEW QUESTION # 22
Which hardware capability do industrial Ethernet (IE) switches have that Enterprise switches do not have?

  • A. additional fans so the switch can be deployed in high-temperature environments
  • B. support for higher ethernet port density
  • C. include a built-in battery
  • D. industrial ruggedization so the switch can operate in harsh environments

Answer: D


NEW QUESTION # 23
Which industrial router platform has Battery Backup Unit (BBU) module?

  • A. IR8340
  • B. IR8140H
  • C. IR1101
  • D. IR1800 Series

Answer: B


NEW QUESTION # 24
Which tool is ideal for a customer that must use a centralized management tool to configure multiple IW9167Es and deploy them in CURWB mode?

  • A. Cisco Prime Infrastructure
  • B. Cisco IOT Operations Dashboard
  • C. Cisco DNA Center
  • D. Cisco vManage

Answer: C


NEW QUESTION # 25
Which two management tools are used to provision and manage an IR1101 Industrial Router? (Choose two.)

  • A. IoT Operations Dashboard
  • B. CiscoWorks
  • C. Cisco Control Center
  • D. Salesforce
  • E. vManage

Answer: A,E


NEW QUESTION # 26
How are the power inputs labeled A and B of IE3400 used?

  • A. Both inputs are connected: only one is active, and the other is on standby.
  • B. Both inputs are connected, and the power budget is the sum of both power inputs.
  • C. It can only wire one of the power inputs.
  • D. Both inputs are connected and used to daisy chain to power another switch.

Answer: A


NEW QUESTION # 27
Which two IE switch types support the Cisco Cyber Vision sensor running on IOx? (Choose two.)

  • A. IE4010 and IE5000
  • B. IE3200 and IE3300-1G
  • C. IE3400 and IE3300-10G
  • D. IE9300 Series
  • E. IE2000 and IE4000

Answer: B,C


NEW QUESTION # 28
Which tool is available on the Troubleshooting tab of a gateway device in the IoT Operations Dashboard?

  • A. remote connection to the subtended devices
  • B. ping and traceroute from the gateway
  • C. report on user access and usage
  • D. menu-driven diagnostic tools for operators

Answer: B


NEW QUESTION # 29
What is a feature of IW6300?

  • A. IW6300 POE output ports support two POE+ (30W) devices at the same time.
  • B. IW6300 is IP54-rated.
  • C. IW6300 is built for Class 1 Division 2 hazardous environments.
  • D. IW6300 can work in CURWB mode.

Answer: A


NEW QUESTION # 30
......

Most Reliable Cisco 700-821 Training Materials: https://vceplus.actualtestsquiz.com/700-821-test-torrent.html