NEW QUESTION 56
Which of the following activities within the KANBAN procedure normally triggers subsequent stock posting of the goods receipt?
- A. Set "Container in process"
- B. Set "Container empty"
- C. Set "Container full"
- D. Set "Container in transport"
Answer: C
NEW QUESTION 57
The company you advise wants to control the availability check in so that when a production and/or process order is created, the following receipts or issues are taken into account: planned orders, purchase orders, production orders, reservations, dependent requirements. When the production and/or process order is released, only the stock that is currently freely usable should be taken into consideration. How can you fulfill this request?
- A. Differentiated assignment of two different checking rules in check control.
- B. Enter an appropriate availability checking rule in the order type.
- C. Activate the freely usable stock in the scope of check.
- D. Enter an appropriate availability checking group in the material master.
Answer: A
NEW QUESTION 58
In SAP ECC, you want to map an in-house production process for general warehouse production. The fields in the area of the lot size-dependent in-house production time are to be populated when the material master for the final product is created. These fields can be maintained by updating from the scheduling result for the associated routing. You now think that there could be significant changes to the production times in the routing and decide against updating the material master. What problem could this lead to?
- A. In the course of basic dates scheduling with requirements planning, dependent requirements request the components from the bill of materials at the wrong times.
- B. Requirements planning runs up against an exception message in basic dates scheduling because the material master parameters do not match the scheduling result from the routing.
- C. Subsequent capacity planning is no longer possible due to the obsolete scheduling parameters.
- D. Lead time scheduling, which occurs by the time that a planned order is converted into a production order (at the latest), cannot take place on the basis of incorrect basic dates.
Answer: A
NEW QUESTION 59
Which of the following statements about the planning functions available in SAP ECC is correct?
- A. In demand management (DM) material shortage situations are identified and corresponding receipt elements are created.
- B. Long-term planning (LTP) is a long-term form of forecast planning.
- C. Material requirements planning (MRP) includes automatic capacity leveling.
- D. Master production scheduling (MPS) refers to preferred planning of important materials.
Answer: D
NEW QUESTION 60
From what point can you no longer use the Read PP master data in the production order?
- A. After the first posting of goods movements or confirmation.
- B. After printing the order papers.
- C. After assigning the confirmed quantity of a material component due to carrying out a material availability check.
- D. From the release of the production order.
Answer: A
NEW QUESTION 61
What features related to process orders can be used to fulfill Good Manufacturing Practices (GMP) requirements? (Choose three)
- A. Resource selection
- B. Approved master recipes
- C. Availability check
- D. Electronic batch record
- E. Digital signature
Answer: B,D,E
NEW QUESTION 62
The master data for an in-house production process is to be set up in the SAP ECC system. To do this, you should create a suitable routing that plans for five operations in an initial sequence (10, 20, 30, 40, 50). There should be an option of relocating operations 30 and 40 to a second sequence on other work centers if there are capacity bottlenecks. What sequence type would you use to create the second sequence in the system?
- A. Substitute sequence
- B. Alternative sequence
- C. Standard sequence
- D. Parallel sequence
Answer: B
NEW QUESTION 63
In which scenario will the error message shown in the attached screenshot occur?
Exhibit:
Exhibit
- A. A valid routing exists, but the material master is set to manual routing selection.
- B. The selection method is set to "selection only by production version" in the material master.
- C. A valid routing exists, but the Customizing for the order type is set to manual routing selection.
- D. The routing is not valid at the explosion date.
Answer: D
NEW QUESTION 64
You want to produce a finished product only when it is requested by a customer order in make-to-order production. However, all assemblies need to be procured beforehand.
How can you fulfill these requirements in SAP ECC? (Choose two)
- A. Use strategy 50 (planning without final assembly) for the finished product and no strategy for all assemblies in the bill of material.
- B. Use strategy 20 (make-to-order production) for the finished product and strategy 70 (planning at the assembly level) for all assemblies in the bill of material.
- C. Use strategy 40 (planning with final assembly) for the finished product and strategy 70 (planning at the assembly level) for all assemblies in the bill of material.
- D. Use strategy 30 (production by lots) for the finished product and strategy 70 (planning at the assembly level) for all assemblies in the bill of material.
Answer: A,B
NEW QUESTION 65
In what sequence are the steps of material requirements planning performed in SAP ECC?
- A. 1. Net requirements calculation
2. Lot sizing
3. Determination of the procurement type
4. Scheduling - B. 1. Net requirements calculation
2. Lot sizing
3. Scheduling
4. Determination of the procurement type - C. 1. Calculation of safety stock
2. Lot sizing
3. Scheduling
4. Determination of the procurement type - D. 1. Availability check
2. Lot sizing
3. Determination of the procurement type
4. Scheduling
Answer: A
NEW QUESTION 66
When testing requirements planning in plant 1000, you receive the error message displayed below. Large numbers of materials are already available in plant 1000. As a first step in solving the problem, you activate requirements planning in the Customizing for plant 1000.
What further tasks do you perform before you can use requirements planning in plant 1000 in SAP ECC?
- A. Activate requirements planning in Customizing for MRP areas in plant 1000 and specify the plant parameters for plant 1000 in the MRP views in material master.
- B. Set up the planning file in Customizing and specify the plant parameters for plant 1000 in Customizing.
- C. Set up the planning files in Customizing and specify the plant parameters for plant 1000 in Customizing of the MRP group.
- D. Set up the planning file in Customizing and specify the plant parameters for plant 1000 in the MRP views in material master.
Answer: B
NEW QUESTION 67
Your customer does not want to manage value-intensive materials in the warehouse. These materials should be procured directly for the production order.
Which BOM item category must you set to fulfill this requirement?
- A. D (document item)
- B. E (external procurement)
- C. N (non-stock item)
- D. M (phantom material)
Answer: C
NEW QUESTION 68
When maintaining a work center, formulas can be assigned in the scheduling view. Formulas use formula parameters for calculation. What can be the origin of the formula parameters used for scheduling? (Choose three.)
- A. Standard value from operation in task list
- B. User-defined field from operation in task list
- C. General values from work scheduling view in the material master
- D. General item values in bill of materials
- E. General operation values in task list
Answer: A,B,E
NEW QUESTION 69
You have maintained planning strategy group 10 (make-to-stock production) in the material master (SAP ECC) of a material. For the coming months, you have planned requirements with requirement type LSF (derived from main strategy 10). Now, you want to change the requirement type from LSF to VSF (in accordance with planning strategy 40, planning with final assembly) for requirements in the existing production plan.
Which of the following scenarios are applicable in this case? (Choose two)
- A. You must change the requirement type for planning strategy 10 to VSF in Customizing. The requirement type for all existing requirements is then changed by the next planning run.
- B. You can change the strategy group from 10 to 40 for the existing production plan in the material master, and the requirement type for all requirements is changed automatically.
- C. You can enter the strategy group 40 in the material master and change the present requirement for the product manually in the production plan.
- D. You can enter the strategy group 40 in the material master, but the requirement type is not changed automatically for existing requirements.
Answer: C,D
NEW QUESTION 70
Which of the following functions does SAP Supply Chain Management (SCM) offer?
- A. Optimization of the procurement strategy with the supplier pool
- B. Planning of supply chains across company boundaries
- C. Product development, safety, quality, and maintenance
- D. Communication with customers through different interaction channels
Answer: B
NEW QUESTION 71
You want to create a new material that - is kept in stock- is externally procured- is used as a component in the bills of material for various final products- must not be sold directly Which standard SAP material type do you use?
- A. NLAG (non-stock material)
- B. FERT (finished product)
- C. HAWA (trading good)
- D. ROH (raw material)
Answer: D
NEW QUESTION 72
Which activities lead to a reduction of the capacity requirements for an operation? (Choose three)
- A. Posting the goods receipt for the production order
- B. Rescheduling the operation
- C. Reducing the order quantity
- D. Confirming the operation
- E. Setting the status technically complete (TECO)
Answer: C,D,E
NEW QUESTION 73
After a material has been included in a NETCH material requirements planning run you change its BOM (bill of materials).
Which of the following planning file entries for this material are set by the system?
- A. The BOM explosion, the NETCH, and the NETPL planning indicators
- B. The BOM explosion and the NETPL planning indicator
- C. The NETCH and NETPL planning indicators
- D. The BOM explosion indicator
Answer: A
NEW QUESTION 74
An enterprise wants to use SAP ECC requirements planning together with the NETPL procedure (net change planning in the planning horizon). The planning horizon is to be set equally for all materials by default.
However, some materials are to be given a different planning horizon.
What procedure would you recommend to the project team for setting the planning horizon on the system side?
- A. The planning horizon is set in the MRP groups in Customizing and the variant values are stored in the material masters for the materials in question.
- B. The planning horizon is set in the plant parameters in Customizing and variant entries are stored in the material masters for the materials in question.
- C. The planning horizon is set in the MRP groups in Customizing and variant entries are assigned via the plant parameter settings.
- D. The planning horizon is set in Customizing using the plant parameter setting and variant entries are assigned via the MRP groups for the materials in question.
Answer: D
NEW QUESTION 75
Which issue can occur if the lot size-dependent in-house production time in the material master is not updated after changing the routing?
- A. Requirements planning creates an appropriate exception message in basic dates scheduling.
- B. Dependent requirements request the components from the bill of materials at wrong times when using basic dates scheduling.
- C. Subsequent capacity planning is no longer possible due to the obsolete scheduling parameters.
- D. Lead time scheduling cannot take place.
Answer: B
NEW QUESTION 76
During a project phase, your customer raises some questions concerning parameters of the procurement type in the material master in the SAP ECC system.
Which of the following procurement type properties are valid? (Choose two)
- A. Procurement types E (in-house production) and F (external procurement) always have to be further refined with special procurement types.
- B. If procurement type E (in-house production) is set, external procurement may still be possible, depending on the material type.
- C. If both procurement types are allowed with entry X (both procurement types), requirements planning assumes in-house production.
- D. Procurement types E (in-house production), F (external procurement), or X (both procurement types) can be selected for a material independent of the material type.
Answer: B,C
NEW QUESTION 77
Which property applies for consumption with planning strategy 40 (planning with final assembly)?
- A. Consumption can increase the total originally planned production quantity.
- B. Consumption creates a static and binding assignment between the planned independent requirements and the customer requirements for the entire procurement process.
- C. Consumption can reduce the total originally planned production quantity.
- D. Consumption takes place with the planning material.
Answer: A
NEW QUESTION 78
You want to reduce the uncertainty caused by fluctuating requirements for a finished product by using a dynamic safety stock in SAP ECC.
On which specifications is the dynamic safety stock calculation based?
- A. The static safety stock per day and the safety time
- B. The static safety stock and the material forecast
- C. The average daily demand and the desired range of coverage
- D. The average daily demand and the safety time
Answer: C
NEW QUESTION 79
......